In November 2020, the following works are being carried out at the construction site of the LUCKY LAND residential complex:

Building No. 3, Section 1:

  • Finished work on the arrangement of the wooden frame.
  • Work is underway to arrange the brickwork of the 6th to 13th floors.
  • Work is underway to arrange the staircases on the 13th floor.
  • Installation of ventilation units is completed.

Building No. 3, Section 2:

  • Finished work on the arrangement of the wooden frame.
  • Work is underway to arrange the brickwork of the 11th floor.
  • Installation of staircases is completed.
  • Installation of ventilation units is completed.

Building No. 3, Section 3:

  • Finished work on the arrangement of the wooden frame.
  • Work is underway to arrange the brickwork of the 7th floor.
  • Work is underway to arrange the staircases on the 13th floor.
  • Ventilation units have been installed on the 7th floor.

Building No. 4, Section 1:

  • Work is underway to arrange the floor slab of the 2nd floor.

Building No. 4, Section 2:

  • Work is underway to arrange the vertical elements of the 1st floor.