Construction progress
01/09/2022

Construction progress for September 2022

The beginning of autumn at the construction site of the Lucky Land comfort-class complex, which is located next to an ancient forest and a modern shopping center, was as fruitful as possible.


In September 2022, the following works were performed at the Lucky Land construction site:

Building No. 3, Section 1:

  • Performance of works on installation of external networks B1, K1, K2;
  • Installation of landscaping near the sales department;
  • Installation of equipment of basement premises;
  • Installation of ceramic tiles on cold passages and stairwells of evacuation exits;
  • Installation of folded roofs on terraces.

Building No. 3, section 2:

  • Installation of basement rooms;
  • Installation of ceramic tiles on cold passages and stairwells of evacuation exits;
  • Installation of a folded roof on the terraces.

Building No. 3, section 3:

  • Installation of basement premises;
  • Installation of facades.

Building No. 4, section 1:

  • Installation of facades;
  • Performance of works on installation of decoration of technical superstructures and ventilation shafts on the roof;
  • Preparatory works for the installation of elevator equipment.

Building No. 4, section 2:

  • Installation of facades;
  • Performance of works on installation of decoration of technical superstructures and ventilation shafts on the roof.

Building No. 4, section 3:

  • Installation of facades;
  • Execution works on arrangement of decoration of technical extras widows and ventilation shafts on the roof.

Building No. 6, section 1:

  • Performance of bricklaying works on the 10th floor.

Building No. 6, section 2:

  • Performance of brickwork installation from the 3rd to 13th floors.