Construction progress
01/08/2022

Construction progress in August 2022

We are happy to report on the work done. Every day we work to bring your meeting with cozy LUCKY LAND closer.


Works that were performed in the period of August-September 2022:

Building No. 3, Section 1:

  • work on the installation of external networks B1, K1, K2 is being carried out;
  • landscaping near the sales department;
  • arrangement of turning structures of the 1st and 2nd floors;
  • arrangement of equipment of basement premises;
  • works on installation of fire doors in technical premises are being carried out;
  • work on the installation of external networks is being carried out.

Building No. 3, Section 2:

  • arrangement of equipment of basement premises;
  • arrangement of turning structures of the 1st and 2nd floors;
  • performing work on glazing the first floors;
  • works on installation of fire doors in technical premises are being carried out.