Construction progress in July 2022

The Lucky Land comfort-class residential complex is located next to a huge forest and a modern shopping center. This is a real city within a city with developed infrastructure, kindergartens and schools, shops and restaurants, children's and sports grounds.


In July 2022, the following works were performed at the construction site of the Lucky Land residential complex:

Building No. 3, Section 1:

  • Works on the arrangement of the facade are being carried out.
  • Repair work is being carried out in the sales department.
  • The transparent enclosing structures of the first floors are being sealed.

Building No. 3, Section 2:

  • Works on the arrangement of the facade are being carried out.
  • The transparent enclosing structures of the first floors are being sealed.

Building No. 3, Section 3:

  • Works on the arrangement of the facade are being carried out.
  • The transparent enclosing structures of the first floors are being sealed.

Building No. 4, Section 1:

  • Works on the arrangement of the facade are being carried out.

Building No. 4, Section 2:

  • Works on the arrangement of the facade are being carried out.

Building No. 4, Section 3:

  • Works on the arrangement of the facade are being carried out.

Building No. 6, section:

  • Installation of ventilation units is in progress.
  • Work on the arrangement of stairwells and marches is being carried out.